Mobilization of 2×9 men sat systems on board DPIII HYSY285, HYSY 287. Pre-commissioning work and function test of Sat systems as per IMCA D024. UWS Disconnection and wet store, Disconnect of 9 flexible risers, change of STP buoy and UWS. Installation of 14 Spool Pieces in Dong Fang field south west china (24”, 14”, 8”). 24” Riser installation Provision of Pre-commissioning work for the 24”, 14”,8” pipe lines (Cleaning, gauging, hydro test and N2 purging).
Client: All Sea Hong Kong
Vessel: HYSY 285 – HYSY 287
Location: OFFSHORE CHINA